Builders (1)
| Company | Contact | Phone | |
|---|---|---|---|
| McNab Building Services | Craig Hillier | 0424 202 911 | craig.hillier@mcnab.net.au |
Contacts (110)
| A Heron | Subject Matter Expert (v1) | Seqwater | 2 | 0.15 | ||
| A Silayo | Author (v1) | Seqwater | 2 | 0.15 | ||
| A. Heron | SME (version 1) | Seqwater | 2 | 0.20 | ||
| A. Silayo | Author (version 1) | Seqwater | 2 | 0.20 | ||
| Africa Silayo | Author (version 2) | Seqwater | 2 | 0.45 | ||
| Annalie Roux | Manager TSI (Approver, Rev 2) | Seqwater | 2 | 0.40 | ||
| Anthony Heron | SME (version 1) | Seqwater | 2 | 0.40 | ||
| Anushuman Bhalla | Author (Version 1) | Seqwater | 2 | 0.25 | ||
| Arran Canning | General Manager, APDD (approver, version 3) | Seqwater | 2 | 0.35 | ||
| Ashburner Francis | Mechanical consultant (FCU noise data and mechanical WIP drawings) | Ashburner Francis | 5 | 0.50 | ||
| Ashburner Francis Consulting Engineers | Hydraulic Consultant (Brisbane Project Office) | Ashburner Francis Consulting Engineers | brisbane@ashburnerfrancis.com.au | (07) 3510 8888 | 2 | 0.95 |
| Ashburner Francis Consulting Engineers Pty Ltd | Ashburner Francis Consulting Engineers Pty Ltd | brisbane@ashburnerfrancis.com.au | 07 3510 8888 | 2 | 0.90 | |
| Asset Information Management (AIM) Unit | Asset information and plant design registration | Seqwater | asset.information@seqwater.com.au | 23 | 0.50 | |
| B Thompson | Approver (v1) | Seqwater | 2 | 0.25 | ||
| B. Thompson | Approver (version 1) | Seqwater | 2 | 0.20 | ||
| Brad Thompson | Approver (version 1) | Seqwater | 2 | 0.40 | ||
| C Otter | Approver (v2) | Seqwater | 2 | 0.30 | ||
| C.P. Johnson (RPEQ 7052) | Principal Geotechnical Engineer - Director | Soil Surveys Engineering Pty Limited | 16 | 0.85 | ||
| Cameron Grant | Architect/Client | Peddle Thorp Architects | C.Grant@peddlethorp.com.au | 1 | 0.90 | |
| Cameron Johnson | Author; Approved for Issue | Soil Surveys Engineering Pty Limited | 2 | 0.85 | ||
| Camilo Montoya | Senior Fire Engineer | Stantec Australia Pty Ltd | 2 | 0.95 | ||
| Chris Banks | Lead Mechanical Engineer (Author/SME, Rev 4) | Seqwater | 1 | 0.55 | ||
| Ciara Otter | General Manager Engineering (Approver, Rev 4) | Seqwater | 2 | 0.60 | ||
| D Schmidt | Author (v2) | Seqwater | 2 | 0.20 | ||
| D. Sheikh | Drafter/Designer (title block) | Peddle Thorp & Harvey Pty Ltd | 1 | 0.40 | ||
| Dale Enright | Verification | Ashburner Francis Consulting Engineers | 2 | 0.85 | ||
| Dan Spiller | General Manager, APDD (approver, version 2) | Seqwater | 2 | 0.35 | ||
| Daniel Sorbello | Architect Responsible / Approver (title block) | Peddle Thorp | 1 | 0.60 | ||
| Daniel Spiller | General Manager - Asset Portfolio Development & Delivery (Approver, Version 1) | Seqwater | 2 | 0.25 | ||
| David Sheikh | Project Technical Lead | Stantec Australia Pty Ltd | 2 | 0.90 | ||
| David Shepherd | Lead OT Engineer (Document Author/SME, Version 10); endorsed the standard RPEQ | Seqwater | 1 | 0.85 | ||
| Edwin Sayers | Seqwater | 25 | 0.55 | |||
| Employee Assistance Program | Seqwater | 1300 360 364 | 35 | 0.40 | ||
| Energex | Supply authority / DNSP | Energex | 23 | 0.30 | ||
| Fatima Ibrahim | Report Preparer (Prepared By, Rev 1) | Steve Watson and Partners | 2 | 0.75 | ||
| G Field | SME (Rev 3) | Seqwater | 2 | 0.25 | ||
| G Henry | Document Approver (Rev 1) | Seqwater | 2 | 0.25 | ||
| G Simmers | Owner (v1 and v2) | Seqwater | 2 | 0.35 | ||
| General Manager - Digital, Technology & Information | Document Approver | Seqwater | 1 | 0.30 | ||
| Geoff Simmers | Owner (version 1); Approver (version 2) | Seqwater | 2 | 0.45 | ||
| Geoff Simmers | Principal Engineering Standards and Assurance (RPEQ, document author and endorser) | Seqwater | 1 | 0.60 | ||
| George Henry | Principal ESS (Owner, Rev 1) | Seqwater | 2 | 0.35 | ||
| Glenn Hamilton | Principal, Fire Engineering Team Leader | Stantec Australia Pty Ltd | 2 | 0.95 | ||
| Harvey | Seqwater | 25 | 0.20 | |||
| Hon. Dr David Hamill AM | Chairperson | Seqwater | 35 | 0.35 | ||
| Hugh Mitchell | Reviewer | Soil Surveys Engineering Pty Limited | 2 | 0.75 | ||
| Jason Bentley | Approving Engineer (RPEQ responsible) | Stantec Australia Pty Ltd | 1 | 0.85 | ||
| Joe Griffin | Verification | Ashburner Francis Consulting Engineers | 2 | 0.85 | ||
| John Tait | Project Engineer | Ashburner Francis Consulting Engineers | 2 | 0.90 | ||
| Jordan Du Rieu | Author (version 1) | Seqwater | 2 | 0.40 | ||
| Luke Hellowell | Author of earlier versions (Principal Engineer / Manager ETS) | Seqwater | 2 | 0.40 | ||
| Luke Price | RPEQ endorser; SME for version 2 | Seqwater | 1 | 0.70 | ||
| Manager DTI Performance | Document Approver | Seqwater | 1 | 0.30 | ||
| Marcus Kamppi | Senior Acoustic Engineer (Author) | Stantec Australia Pty Ltd | (07) 3811 4500 | 17 | 0.95 | |
| Marcus Kamppi | Author (Acoustic Engineering, Prepared By) | Stantec Australia Pty Ltd | 1 | 0.80 | ||
| Matt Bennet | Building Certifier | Steve Watson & Partners | 7 | 0.80 | ||
| Matt Bennett | Reviewer (Reviewed By, Rev 1) / Preparer (Rev 1.1) | Steve Watson and Partners | 2 | 0.60 | ||
| Matt McCahon | Manager Technical Support & Improvement (document approver) | Seqwater | 2 | 0.55 | ||
| Matthew McCahon | Document Approver (Rev 3) | Seqwater | 2 | 0.25 | ||
| Mike Rutherford | Cert Coating Inspector, Director | Conspectus (QLD) P/L | 2 | 0.45 | ||
| Minuka Mendis | Preparer | Stantec Australia Pty Ltd | 1 | 0.90 | ||
| Nalaka Vitharana | Manager ETS (approver, earlier versions) | Seqwater | 2 | 0.40 | ||
| Pallavi Joshi | Lead OT Engineer (Author/SME, Versions 2-9) | Seqwater | 2 | 0.40 | ||
| Paul McKenna | Project Engineer | Ashburner Francis Consulting Engineers | 2 | 0.95 | ||
| Peddle Thorp | Architect | Peddle Thorp | info@peddlethorp.com.au | +61 (7) 3811 9500 | 1 | 0.90 |
| Peddle Thorp & Harvey Pty Ltd | Design consultant (document author, architect) | Peddle Thorp & Harvey Pty Ltd | 1 | 0.35 | ||
| Peddle Thorp & Harvey Pty Ltd (Peddle Thorp) | Peddle Thorp & Harvey Pty Ltd | info@peddlethorp.com.au | +61 (7) 3811 9500 | 1 | 0.85 | |
| People and Culture team | Seqwater | peopleandculture@seqwater.com.au | 35 | 0.50 | ||
| Principal Engineering Standards and Assurance | Document Owner position | Seqwater | 1 | 0.40 | ||
| Queensland Fire Department (QFD) | Fire Brigade Advice (TBC) | Queensland Fire Department | 8 | 0.50 | ||
| R Curro | SME (Rev 1) | Seqwater | 2 | 0.25 | ||
| R Davies | Author (Rev 1) | Seqwater | 2 | 0.25 | ||
| Rees Davies | Author (Rev 1) | Seqwater | 2 | 0.35 | ||
| Richard Blackburne | Team Leader, Process & Analysis (Document Owner, Version 10) | Seqwater | 2 | 0.90 | ||
| S Jambagi | SME (Rev 2) | Seqwater | 2 | 0.25 | ||
| S. Lilwall | Verification / QA | Ashburner Francis Consulting Engineers Pty Ltd | 2 | 0.80 | ||
| S. Smith | Project Engineer | Ashburner Francis Consulting Engineers Pty Ltd | 2 | 0.80 | ||
| Samanvitha Seethal | Quality Reviewer | Stantec Australia Pty Ltd | 1 | 0.85 | ||
| Santhosh Jambagi | SME (Subject Matter Expert), endorser | Seqwater | 1 | 0.60 | ||
| SEQ Water | Client/Principal | SEQ Water | 1 | 0.70 | ||
| Seqwater | Client / Principal | Seqwater | 1300 737 928 | 2 | 0.60 | |
| Seqwater Central Region Stores | Standard signs store (Mt Crosby WTP) | Seqwater | StoreCentral@seqwater.com.au | 59 | 0.80 | |
| Seqwater Communication, Education and Engagement team | Seqwater | digitalandcreativeservices@seqwater.com.au | 2 | 0.60 | ||
| Seqwater Communications | Seqwater | communications@seqwater.com.au | 1300 737 928 | 28 | 0.55 | |
| Seqwater Energy Team | Seqwater | energy@seqwater.com.au | 46 | 0.85 | ||
| Seqwater Engineering Mailbox | Submission point for deviation requests and ambiguity queries | Seqwater | 10 | 0.35 | ||
| Seqwater Engineering Standards and Assurance (Engineering Mailbox) | Engineering Mailbox / ESA Unit | Seqwater | engineering@seqwater.com.au | 33 | 0.80 | |
| Seqwater Enterprise Architecture and Information | Document Owner (Enterprise Architect) / Doc Approver (Team Lead Enterprise Architecture and Information) | Seqwater | 1 | 0.40 | ||
| Seqwater Facilities | Facilities reporting (leaks and maintenance issues) | Seqwater | facilities@seqwater.com.au | 1300 737 928 | 32 | 0.50 |
| Seqwater Head Office | Head Office | Seqwater | energy@seqwater.com.au | (07) 3035 5600 | 54 | 0.80 |
| Seqwater Main Office | Seqwater | +61 7 3035 5500 | 16 | 0.35 | ||
| Seqwater North Region Stores | Standard signs store (North Pine WTP) | Seqwater | StoreNorth@seqwater.com.au | 59 | 0.80 | |
| Seqwater Signage Team | Signage enquiries and orders | Seqwater | signage@seqwater.com.au | 4 | 0.90 | |
| Seqwater Southern Region Stores | Standard signs store (Hinze Dam WTP) | Seqwater | StoreSouth@seqwater.com.au | 59 | 0.80 | |
| Smera Poulose | Fire Safety Engineer | Stantec Australia Pty Ltd | 2 | 0.85 | ||
| Soil Surveys Engineering Pty Limited | Soil Surveys Engineering Pty Limited | info@soilsurveys.com.au | +617 3369 6000 | 2 | 0.70 | |
| Stantec | Engineer (structural design consultant) | Stantec | 1 | 0.80 | ||
| Stantec Australia Pty Ltd | Contractor Appointed Civil Engineer | Stantec Australia Pty Ltd | +61 7 3029 5000 | 1 | 0.90 | |
| Stantec Australia Pty. Ltd. | Stantec Australia Pty. Ltd. | +61 7 3029 5000 | 1 | 0.85 | ||
| Steve Russell | Manager, Service Delivery (Document Approver, Version 10) | Seqwater | 2 | 0.90 | ||
| Steve Watson & Partners | Building Certifier | Steve Watson & Partners Pty Ltd | info@swpartners.com.au | +61 2 9283 6555 | 37 | 0.80 |
| Steve Watson and Partners Pty Ltd | Building Certification / BCA Consultant | Steve Watson and Partners Pty Ltd | info@swpartners.com.au | +61 2 9283 6555 | 1 | 0.85 |
| Stopline | Independent anonymous reporting service | Stopline | seqwater@stopline.com.au | 1300 30 45 50 | 35 | 0.50 |
| T Berry | Author (Rev 4) | Seqwater | 2 | 0.30 | ||
| Team Lead Architecture - P7437 | Document Owner | Seqwater | 1 | 0.25 | ||
| TJ | Drafter/Designer (initials only) | Stantec Australia Pty. Ltd. | 1 | 0.30 | ||
| Tony Myatt | Seqwater | 24 | 0.55 | |||
| URS Australia Pty. Ltd. | URS Australia Pty. Ltd. | +61 7 3243 2111 | 1 | 0.60 | ||
| Wayne Quin | Project Technical Lead (prepared by; checked and approved specification) | Stantec Australia Pty Ltd | 1 | 0.90 | ||
| Work Health and Safety Team | WHS queries and support | Seqwater | safety@seqwater.com.au | 22 | 0.50 |
BOM — from schedules (49)
| 12-person meeting table | Long meeting table, 12P | 2 | ea | — | 1 | 0.80 | ||
| 4-person meeting table | Meeting table, 4P | 1 | ea | — | 1 | 0.65 | ||
| 8-person meeting table | Meeting table, 8P | 1 | ea | — | 1 | 0.75 | ||
| AV / monitor unit | Screens at workstations | 50 | ea | — | 1 | 0.30 | ||
| AV screen / monitor | Screen at workstations | 55 | ea | — | 1 | 0.30 | ||
| bed | Think space / bed | 2 | ea | — | 1 | 0.70 | ||
| bed | 2 | ea | — | 1 | 0.60 | |||
| chair | 2 | ea | — | 1 | 0.50 | |||
| chair | 4 | ea | — | 1 | 0.50 | |||
| chair | 2 | ea | — | 1 | 0.35 | |||
| chair | 1 | ea | — | 1 | 0.40 | |||
| chair | 2 | ea | — | 1 | 0.50 | |||
| chair | 4 | ea | — | 1 | 0.40 | |||
| chair | 2 | ea | — | 1 | 0.40 | |||
| collaboration table | Table in the collaboration room | 1 | ea | — | 1 | 0.30 | ||
| courtyard table set | Outdoor tables with bench seating | 3 | ea | — | 1 | 0.50 | ||
| fridge | 2 | ea | — | 1 | 0.40 | |||
| laboratory bench | Lab bench and island fit-out | 2 | ea | — | 1 | 0.30 | ||
| lobby table | Small table | 3 | ea | — | 1 | 0.50 | ||
| meeting chair | 12x per meeting room | 24 | ea | — | 1 | 0.55 | ||
| meeting chair | 8x CH3B for 8P meeting | 8 | ea | — | 1 | 0.50 | ||
| meeting chair | 4x CH3B for 4P meeting | 4 | ea | — | 1 | 0.50 | ||
| meeting chair | Chairs around the 12P tables (about 12 per table) | 24 | ea | — | 1 | 0.60 | ||
| meeting chair | Chairs around the 8P table | 8 | ea | — | 1 | 0.55 | ||
| meeting chair | Chairs around the 4P table | 4 | ea | — | 1 | 0.50 | ||
| meeting table | Table modules forming 12P meeting tables | 8 | ea | — | 1 | 0.70 | ||
| meeting table | 8P meeting table modules | 4 | ea | — | 1 | 0.65 | ||
| meeting table | 4P meeting table | 1 | ea | — | 1 | 0.70 | ||
| meeting table | Meeting tables with chairs | 8 | ea | — | 1 | 0.60 | ||
| meeting table | 4 | ea | — | 1 | 0.60 | |||
| meeting table | 1 | ea | — | 1 | 0.50 | |||
| office furniture | 2 | ea | — | 1 | 0.30 | |||
| outdoor table | Courtyard table with benches | 3 | ea | — | 1 | 0.80 | ||
| outdoor table | 3 | ea | — | 1 | 0.80 | |||
| round stool / café table | Round seating at the kitchen breakout | 3 | ea | — | 1 | 0.40 | ||
| small table | 1 | ea | — | 1 | 0.40 | |||
| stool/chair | 3 | ea | — | 1 | 0.40 | |||
| table | 3 | ea | — | 1 | 0.50 | |||
| task chair | Task chair at workstations | 70 | ea | — | 1 | 0.40 | ||
| task chair | 60 | ea | — | 1 | 0.35 | |||
| think space bed / daybed | Think space / bed 1 and bed 2 | 2 | ea | — | 1 | 0.50 | ||
| workstation cluster (bench desks with chairs) | Open-office desk clusters, drawn as paired desks with task chairs | 12 | ea | — | 1 | 0.40 | ||
| workstation cluster (bench desks with chairs) | Operational work point desk clusters, drawn as paired desks with task chairs | 15 | ea | — | 1 | 0.35 | ||
| workstation desk | Paired workstation; AV3 screens and CH1 chairs associated | 44 | ea | — | 1 | 0.50 | ||
| workstation desk | Workstation type 3, Operational work points | 10 | ea | — | 1 | 0.45 | ||
| workstation desk | Workstation type 2, along perimeter | 8 | ea | — | 1 | 0.35 | ||
| workstation desk | Paired workstation desks in open office rows | 44 | ea | — | 1 | 0.40 | ||
| workstation desk | 10 | ea | — | 1 | 0.40 | |||
| workstation desk | 1 | ea | — | 1 | 0.30 | |||
| Total (valued lines) | — | |||||||
Feedback loop
✓ = correct · ✗ = delete (wrong) · 🚩 = flag with a note. Everything lands in the corrections log.
- Luke Price — RPEQ endorser; SME for version 2 (Seqwater)Contact · p.1
- Jordan Du Rieu — Author (version 1) (Seqwater)Contact · p.2
- Anthony Heron — SME (version 1) (Seqwater)Contact · p.2
- Geoff Simmers — Owner (version 1); Approver (version 2) (Seqwater)Contact · p.2
- Brad Thompson — Approver (version 1) (Seqwater)Contact · p.2
- Africa Silayo — Author (version 2) (Seqwater)Contact · p.2
- Steve Watson and Partners Pty Ltd — Building Certification / BCA Consultant (Steve Watson and Partners Pty Ltd)Contact · p.1info@swpartners.com.au · +61 2 9283 6555
- Matt Bennett — Reviewer (Reviewed By, Rev 1) / Preparer (Rev 1.1) (Steve Watson and Partners)Contact · p.2
- Fatima Ibrahim — Report Preparer (Prepared By, Rev 1) (Steve Watson and Partners)Contact · p.2
- David Shepherd — Lead OT Engineer (Document Author/SME, Version 10); endorsed the standard RPEQ (Seqwater)Contact · p.1
- Richard Blackburne — Team Leader, Process & Analysis (Document Owner, Version 10) (Seqwater)Contact · p.2
- Steve Russell — Manager, Service Delivery (Document Approver, Version 10) (Seqwater)Contact · p.2
- Pallavi Joshi — Lead OT Engineer (Author/SME, Versions 2-9) (Seqwater)Contact · p.2
- Daniel Spiller — General Manager - Asset Portfolio Development & Delivery (Approver, Version 1) (Seqwater)Contact · p.2
- Anushuman Bhalla — Author (Version 1) (Seqwater)Contact · p.2
- D Schmidt — Author (v2) (Seqwater)Contact · p.2
- G Simmers — Owner (v1 and v2) (Seqwater)Contact · p.2
- C Otter — Approver (v2) (Seqwater)Contact · p.2
- A Silayo — Author (v1) (Seqwater)Contact · p.2
- A Heron — Subject Matter Expert (v1) (Seqwater)Contact · p.2
- B Thompson — Approver (v1) (Seqwater)Contact · p.2
- Principal Engineering Standards and Assurance — Document Owner position (Seqwater)Contact · p.1
- Seqwater Engineering Mailbox — Submission point for deviation requests and ambiguity queries (Seqwater)Contact · p.10
- Energex — Supply authority / DNSP (Energex)Contact · p.23
- Stantec — Engineer (structural design consultant) (Stantec)Contact · p.1
- D. Sheikh — Drafter/Designer (title block) (Peddle Thorp & Harvey Pty Ltd)Contact · p.1
- John Tait — Project Engineer (Ashburner Francis Consulting Engineers)Contact · p.2
- Dale Enright — Verification (Ashburner Francis Consulting Engineers)Contact · p.2
- SEQ Water — Client/Principal (SEQ Water)Contact · p.1
- Stantec Australia Pty. Ltd. (Stantec Australia Pty. Ltd.)Contact · p.1+61 7 3029 5000
- Geoff Simmers — Principal Engineering Standards and Assurance (RPEQ, document author and endorser) (Seqwater)Contact · p.1
- Matt McCahon — Manager Technical Support & Improvement (document approver) (Seqwater)Contact · p.2
- Luke Hellowell — Author of earlier versions (Principal Engineer / Manager ETS) (Seqwater)Contact · p.2
- Nalaka Vitharana — Manager ETS (approver, earlier versions) (Seqwater)Contact · p.2
- Dan Spiller — General Manager, APDD (approver, version 2) (Seqwater)Contact · p.2
- Arran Canning — General Manager, APDD (approver, version 3) (Seqwater)Contact · p.2
- Seqwater Engineering Standards and Assurance (Engineering Mailbox) — Engineering Mailbox / ESA Unit (Seqwater)Contact · p.33engineering@seqwater.com.au
- Work Health and Safety Team — WHS queries and support (Seqwater)Contact · p.22safety@seqwater.com.au
- Asset Information Management (AIM) Unit — Asset information and plant design registration (Seqwater)Contact · p.23asset.information@seqwater.com.au
- General Manager - Digital, Technology & Information — Document Approver (Seqwater)Contact · p.1
- Seqwater Communication, Education and Engagement team (Seqwater)Contact · p.2digitalandcreativeservices@seqwater.com.au
- Seqwater Communications (Seqwater)Contact · p.28communications@seqwater.com.au · 1300 737 928
- Seqwater Facilities — Facilities reporting (leaks and maintenance issues) (Seqwater)Contact · p.32facilities@seqwater.com.au · 1300 737 928
- Seqwater Main Office (Seqwater)Contact · p.16+61 7 3035 5500
- People and Culture team (Seqwater)Contact · p.35peopleandculture@seqwater.com.au
- Employee Assistance Program (Seqwater)Contact · p.351300 360 364
- Stopline — Independent anonymous reporting service (Stopline)Contact · p.35seqwater@stopline.com.au · 1300 30 45 50
- Hon. Dr David Hamill AM — Chairperson (Seqwater)Contact · p.35
- Peddle Thorp — Architect (Peddle Thorp)Contact · p.1info@peddlethorp.com.au · +61 (7) 3811 9500
- Daniel Sorbello — Architect Responsible / Approver (title block) (Peddle Thorp)Contact · p.1
- Camilo Montoya — Senior Fire Engineer (Stantec Australia Pty Ltd)Contact · p.2
- Glenn Hamilton — Principal, Fire Engineering Team Leader (Stantec Australia Pty Ltd)Contact · p.2
- Smera Poulose — Fire Safety Engineer (Stantec Australia Pty Ltd)Contact · p.2
- Matt Bennet — Building Certifier (Steve Watson & Partners)Contact · p.7
- Steve Watson & Partners — Building Certifier (Steve Watson & Partners Pty Ltd)Contact · p.37info@swpartners.com.au · +61 2 9283 6555
- Queensland Fire Department (QFD) — Fire Brigade Advice (TBC) (Queensland Fire Department)Contact · p.8
- Santhosh Jambagi — SME (Subject Matter Expert), endorser (Seqwater)Contact · p.1
- Tony Myatt (Seqwater)Contact · p.24
- Edwin Sayers (Seqwater)Contact · p.25
- Seqwater Enterprise Architecture and Information — Document Owner (Enterprise Architect) / Doc Approver (Team Lead Enterprise Architecture and Information) (Seqwater)Contact · p.1
- Harvey (Seqwater)Contact · p.25
- TJ — Drafter/Designer (initials only) (Stantec Australia Pty. Ltd.)Contact · p.1
- R Curro — SME (Rev 1) (Seqwater)Contact · p.2
- G Henry — Document Approver (Rev 1) (Seqwater)Contact · p.2
- T Berry — Author (Rev 4) (Seqwater)Contact · p.2
- G Field — SME (Rev 3) (Seqwater)Contact · p.2
- Matthew McCahon — Document Approver (Rev 3) (Seqwater)Contact · p.2
- S Jambagi — SME (Rev 2) (Seqwater)Contact · p.2
- R Davies — Author (Rev 1) (Seqwater)Contact · p.2
- Wayne Quin — Project Technical Lead (prepared by; checked and approved specification) (Stantec Australia Pty Ltd)Contact · p.1
- Seqwater Energy Team (Seqwater)Contact · p.46energy@seqwater.com.au
- Seqwater Head Office — Head Office (Seqwater)Contact · p.54energy@seqwater.com.au · (07) 3035 5600
- Marcus Kamppi — Senior Acoustic Engineer (Author) (Stantec Australia Pty Ltd)Contact · p.17(07) 3811 4500
- Ashburner Francis — Mechanical consultant (FCU noise data and mechanical WIP drawings) (Ashburner Francis)Contact · p.5
- URS Australia Pty. Ltd. (URS Australia Pty. Ltd.)Contact · p.1+61 7 3243 2111
- Minuka Mendis — Preparer (Stantec Australia Pty Ltd)Contact · p.1
- David Sheikh — Project Technical Lead (Stantec Australia Pty Ltd)Contact · p.2
- Jason Bentley — Approving Engineer (RPEQ responsible) (Stantec Australia Pty Ltd)Contact · p.1
- Stantec Australia Pty Ltd — Contractor Appointed Civil Engineer (Stantec Australia Pty Ltd)Contact · p.1+61 7 3029 5000
- Seqwater Signage Team — Signage enquiries and orders (Seqwater)Contact · p.4signage@seqwater.com.au
- Seqwater North Region Stores — Standard signs store (North Pine WTP) (Seqwater)Contact · p.59StoreNorth@seqwater.com.au
- Seqwater Central Region Stores — Standard signs store (Mt Crosby WTP) (Seqwater)Contact · p.59StoreCentral@seqwater.com.au
- Seqwater Southern Region Stores — Standard signs store (Hinze Dam WTP) (Seqwater)Contact · p.59StoreSouth@seqwater.com.au
- Marcus Kamppi — Author (Acoustic Engineering, Prepared By) (Stantec Australia Pty Ltd)Contact · p.1
- Cameron Johnson — Author; Approved for Issue (Soil Surveys Engineering Pty Limited)Contact · p.2
- Hugh Mitchell — Reviewer (Soil Surveys Engineering Pty Limited)Contact · p.2
- C.P. Johnson (RPEQ 7052) — Principal Geotechnical Engineer - Director (Soil Surveys Engineering Pty Limited)Contact · p.16
- Soil Surveys Engineering Pty Limited (Soil Surveys Engineering Pty Limited)Contact · p.2info@soilsurveys.com.au · +617 3369 6000
- Cameron Grant — Architect/Client (Peddle Thorp Architects)Contact · p.1C.Grant@peddlethorp.com.au
- Samanvitha Seethal — Quality Reviewer (Stantec Australia Pty Ltd)Contact · p.1
- Peddle Thorp & Harvey Pty Ltd — Design consultant (document author, architect) (Peddle Thorp & Harvey Pty Ltd)Contact · p.1
- Seqwater — Client / Principal (Seqwater)Contact · p.21300 737 928
- Ashburner Francis Consulting Engineers — Hydraulic Consultant (Brisbane Project Office) (Ashburner Francis Consulting Engineers)Contact · p.2brisbane@ashburnerfrancis.com.au · (07) 3510 8888
- Paul McKenna — Project Engineer (Ashburner Francis Consulting Engineers)Contact · p.2
- Joe Griffin — Verification (Ashburner Francis Consulting Engineers)Contact · p.2
- Team Lead Architecture - P7437 — Document Owner (Seqwater)Contact · p.1
- Manager DTI Performance — Document Approver (Seqwater)Contact · p.1
- A. Silayo — Author (version 1) (Seqwater)Contact · p.2
- A. Heron — SME (version 1) (Seqwater)Contact · p.2
- B. Thompson — Approver (version 1) (Seqwater)Contact · p.2
- Peddle Thorp & Harvey Pty Ltd (Peddle Thorp) (Peddle Thorp & Harvey Pty Ltd)Contact · p.1info@peddlethorp.com.au · +61 (7) 3811 9500
- Ashburner Francis Consulting Engineers Pty Ltd (Ashburner Francis Consulting Engineers Pty Ltd)Contact · p.2brisbane@ashburnerfrancis.com.au · 07 3510 8888
- S. Smith — Project Engineer (Ashburner Francis Consulting Engineers Pty Ltd)Contact · p.2
- S. Lilwall — Verification / QA (Ashburner Francis Consulting Engineers Pty Ltd)Contact · p.2
- Chris Banks — Lead Mechanical Engineer (Author/SME, Rev 4) (Seqwater)Contact · p.1
- Ciara Otter — General Manager Engineering (Approver, Rev 4) (Seqwater)Contact · p.2
- Mike Rutherford — Cert Coating Inspector, Director (Conspectus (QLD) P/L)Contact · p.2
- Annalie Roux — Manager TSI (Approver, Rev 2) (Seqwater)Contact · p.2
- Rees Davies — Author (Rev 1) (Seqwater)Contact · p.2
- George Henry — Principal ESS (Owner, Rev 1) (Seqwater)Contact · p.2
- workstation desk — Paired workstation; AV3 screens and CH1 chairs associatedBOM · p.1qty 44 ea
- workstation desk — Workstation type 3, Operational work pointsBOM · p.1qty 10 ea
- workstation desk — Workstation type 2, along perimeterBOM · p.1qty 8 ea
- task chair — Task chair at workstationsBOM · p.1qty 70 ea
- AV screen / monitor — Screen at workstationsBOM · p.1qty 55 ea
- meeting table — Table modules forming 12P meeting tablesBOM · p.1qty 8 ea
- meeting chair — 12x per meeting roomBOM · p.1qty 24 ea
- meeting table — 8P meeting table modulesBOM · p.1qty 4 ea
- meeting chair — 8x CH3B for 8P meetingBOM · p.1qty 8 ea
- meeting table — 4P meeting tableBOM · p.1qty 1 ea
- meeting chair — 4x CH3B for 4P meetingBOM · p.1qty 4 ea
- outdoor table — Courtyard table with benchesBOM · p.1qty 3 ea
- lobby table — Small tableBOM · p.1qty 3 ea
- bed — Think space / bedBOM · p.1qty 2 ea
- chairBOM · p.1qty 2 ea
- chairBOM · p.1qty 4 ea
- small tableBOM · p.1qty 1 ea
- stool/chairBOM · p.1qty 3 ea
- chairBOM · p.1qty 2 ea
- chairBOM · p.1qty 1 ea
- office furnitureBOM · p.1qty 2 ea
- fridgeBOM · p.1qty 2 ea
- think space bed / daybed — Think space / bed 1 and bed 2BOM · p.1qty 2 ea
- workstation cluster (bench desks with chairs) — Open-office desk clusters, drawn as paired desks with task chairsBOM · p.1qty 12 ea
- workstation cluster (bench desks with chairs) — Operational work point desk clusters, drawn as paired desks with task chairsBOM · p.1qty 15 ea
- 12-person meeting table — Long meeting table, 12PBOM · p.1qty 2 ea
- meeting chair — Chairs around the 12P tables (about 12 per table)BOM · p.1qty 24 ea
- 8-person meeting table — Meeting table, 8PBOM · p.1qty 1 ea
- meeting chair — Chairs around the 8P tableBOM · p.1qty 8 ea
- 4-person meeting table — Meeting table, 4PBOM · p.1qty 1 ea
- meeting chair — Chairs around the 4P tableBOM · p.1qty 4 ea
- courtyard table set — Outdoor tables with bench seatingBOM · p.1qty 3 ea
- round stool / café table — Round seating at the kitchen breakoutBOM · p.1qty 3 ea
- laboratory bench — Lab bench and island fit-outBOM · p.1qty 2 ea
- collaboration table — Table in the collaboration roomBOM · p.1qty 1 ea
- workstation desk — Paired workstation desks in open office rowsBOM · p.1qty 44 ea
- workstation deskBOM · p.1qty 10 ea
- workstation deskBOM · p.1qty 1 ea
- task chairBOM · p.1qty 60 ea
- AV / monitor unit — Screens at workstationsBOM · p.1qty 50 ea
- meeting table — Meeting tables with chairsBOM · p.1qty 8 ea
- meeting tableBOM · p.1qty 4 ea
- meeting tableBOM · p.1qty 1 ea
- outdoor tableBOM · p.1qty 3 ea
- tableBOM · p.1qty 3 ea
- bedBOM · p.1qty 2 ea
- chairBOM · p.1qty 2 ea
- chairBOM · p.1qty 4 ea
- chairBOM · p.1qty 2 ea