← All tenders
194292 — Pittwater High School Science Lab Upgrade | Buildster
Status: new · 8 files · 31 extracted items
Builders (1)
| Company | Contact | Phone | |
|---|---|---|---|
| Buildster | Hamish Dehghan | 0449 926 113 | hamish@buildster.com.au |
Contacts (6)
| Enware | Supplier (Emergency Eyewash Sign) | Enware | (02) 8536 4081 | 19 | 0.85 | |
| Flamestop | Supplier (Portable fire extinguisher and EXIT signs) | Flamestop | 19 | 0.40 | ||
| Incident Report and Support Hotline | Asbestos incident reporting (within 24 hours) | NSW Department of Education | 1800 811 523 | 8 | 0.60 | |
| NSW Department of Education - Compliance | Compliance enquiries for the Asbestos Management Plan | NSW Department of Education | compliance@det.nsw.edu.au | 2 | 0.80 | |
| NSW Environment Protection Authority | Reporting of illegal dumping | NSW Environment Protection Authority | 131 555 | 8 | 0.55 | |
| School Security Unit | Reporting of vandalism | NSW Department of Education | 1300 880 021 | 8 | 0.55 |
BOM — from schedules (25)
| central island bench | Existing central bench with sink, to be removed | 1 | ea | — | 9 | 0.50 | ||
| compactus | Existing compactus to be retained | 1 | ea | — | 9 | 0.40 | ||
| compactus (retain) | Retain compactus | 1 | ea | — | 3 | 0.80 | ||
| fixed bench | Existing fixed bench labelled "FIXED BENCH"; some sink and cap-off notes apply to the demolition | 3 | ea | — | 9 | 0.60 | ||
| fixed bench (to be demolished) | FIXED BENCH along north, east and west walls; 'demolish bench' / 'demolish cupboard and bench' | 4 | ea | — | 3 | 0.50 | ||
| fixed bench with sink (to be demolished) | Demolish bench, sink & cap off services | 4 | ea | — | 3 | 0.55 | ||
| freezer | FREEZER-ex, existing; note says to clear the freezer | 1 | ea | — | 9 | 0.50 | ||
| freezer (retain) | Raise HWH to clear freezer | 1 | ea | — | 3 | 0.70 | ||
| fridge (retain) | Existing fridge | 1 | ea | — | 3 | 0.60 | ||
| heater (retain) | Retain heater | 1 | ea | — | 3 | 0.60 | ||
| hot water heater | Raise HWH to clear freezer | 1 | ea | — | 3 | 0.60 | ||
| island bench | Central bench tagged 01 / JU-3 on the proposed layouts; counted once across both views | 1 | ea | — | 9 | 0.55 | ||
| island bench (to be removed) | Remove island bench | 1 | ea | — | 3 | 0.85 | ||
| joinery unit (bench/cupboard, back wall) | Joinery unit tag shown on the proposed trade waste and water services layouts; same unit appears in both views and is counted once | 1 | ea | — | 9 | 0.50 | ||
| joinery unit (left wall) | Joinery unit tag shown on the proposed layouts; counted once across both views | 1 | ea | — | 9 | 0.50 | ||
| joinery unit (right wall) | Joinery unit tag shown on the proposed layouts; counted once across both views | 1 | ea | — | 9 | 0.50 | ||
| joinery unit with sink (left wall) | Joinery unit tag shown on the proposed layouts; the sink is connected to the trade waste pipework | 1 | ea | — | 9 | 0.45 | ||
| lab bench with sink (to be demolished) | Demolish lab bench & cap off services | 2 | ea | — | 3 | 0.75 | ||
| O/H cupboard (to be demolished) | O/H CUPBOARD on west and east sides of the prep room | 2 | ea | — | 3 | 0.55 | ||
| O/H display cupboard (to be demolished) | O/H DISPLAY CUPBOARD along west wall; 'demolish cupboard' called out three times | 3 | ea | — | 3 | 0.60 | ||
| O/H projector (retain) | Existing overhead projector, retained | 1 | ea | — | 3 | 0.70 | ||
| overhead cupboard | Existing O/H cupboard, one on each side wall | 2 | ea | — | 9 | 0.60 | ||
| shelving | Existing shelving to be demolished, one on each side wall | 2 | ea | — | 9 | 0.55 | ||
| shelving and bench (to be demolished) | SHELVING with bench; demolish shelving and bench | 2 | ea | — | 3 | 0.80 | ||
| whiteboard (retain) | Retain whiteboard, O/H projector & associated equipment | 1 | ea | — | 3 | 0.70 | ||
| Total (valued lines) | — | |||||||
Feedback loop
✓ = correct · ✗ = delete (wrong) · 🚩 = flag with a note. Everything lands in the corrections log.
- School Security Unit — Reporting of vandalism (NSW Department of Education)Contact · p.81300 880 021
- Enware — Supplier (Emergency Eyewash Sign) (Enware)Contact · p.19(02) 8536 4081
- Flamestop — Supplier (Portable fire extinguisher and EXIT signs) (Flamestop)Contact · p.19
- NSW Environment Protection Authority — Reporting of illegal dumping (NSW Environment Protection Authority)Contact · p.8131 555
- NSW Department of Education - Compliance — Compliance enquiries for the Asbestos Management Plan (NSW Department of Education)Contact · p.2compliance@det.nsw.edu.au
- Incident Report and Support Hotline — Asbestos incident reporting (within 24 hours) (NSW Department of Education)Contact · p.81800 811 523
- joinery unit (bench/cupboard, back wall) — Joinery unit tag shown on the proposed trade waste and water services layouts; same unit appears in both views and is counted onceBOM · p.9qty 1 ea
- joinery unit (right wall) — Joinery unit tag shown on the proposed layouts; counted once across both viewsBOM · p.9qty 1 ea
- island bench — Central bench tagged 01 / JU-3 on the proposed layouts; counted once across both viewsBOM · p.9qty 1 ea
- joinery unit (left wall) — Joinery unit tag shown on the proposed layouts; counted once across both viewsBOM · p.9qty 1 ea
- joinery unit with sink (left wall) — Joinery unit tag shown on the proposed layouts; the sink is connected to the trade waste pipeworkBOM · p.9qty 1 ea
- fixed bench — Existing fixed bench labelled "FIXED BENCH"; some sink and cap-off notes apply to the demolitionBOM · p.9qty 3 ea
- overhead cupboard — Existing O/H cupboard, one on each side wallBOM · p.9qty 2 ea
- shelving — Existing shelving to be demolished, one on each side wallBOM · p.9qty 2 ea
- central island bench — Existing central bench with sink, to be removedBOM · p.9qty 1 ea
- freezer — FREEZER-ex, existing; note says to clear the freezerBOM · p.9qty 1 ea
- compactus — Existing compactus to be retainedBOM · p.9qty 1 ea
- O/H display cupboard (to be demolished) — O/H DISPLAY CUPBOARD along west wall; 'demolish cupboard' called out three timesBOM · p.3qty 3 ea
- lab bench with sink (to be demolished) — Demolish lab bench & cap off servicesBOM · p.3qty 2 ea
- heater (retain) — Retain heaterBOM · p.3qty 1 ea
- whiteboard (retain) — Retain whiteboard, O/H projector & associated equipmentBOM · p.3qty 1 ea
- O/H projector (retain) — Existing overhead projector, retainedBOM · p.3qty 1 ea
- fixed bench with sink (to be demolished) — Demolish bench, sink & cap off servicesBOM · p.3qty 4 ea
- fixed bench (to be demolished) — FIXED BENCH along north, east and west walls; 'demolish bench' / 'demolish cupboard and bench'BOM · p.3qty 4 ea
- O/H cupboard (to be demolished) — O/H CUPBOARD on west and east sides of the prep roomBOM · p.3qty 2 ea
- island bench (to be removed) — Remove island benchBOM · p.3qty 1 ea
- shelving and bench (to be demolished) — SHELVING with bench; demolish shelving and benchBOM · p.3qty 2 ea
- compactus (retain) — Retain compactusBOM · p.3qty 1 ea
- freezer (retain) — Raise HWH to clear freezerBOM · p.3qty 1 ea
- fridge (retain) — Existing fridgeBOM · p.3qty 1 ea
- hot water heater — Raise HWH to clear freezerBOM · p.3qty 1 ea